Quality Control Checklist for China Imports: Pre-Shipment Inspection Guide

Quality Control Checklist for China Imports: Pre-Shipment Inspection Guide
MandarinDesk · China SourcingUpdated November 20265 min read

A pre-shipment inspection (PSI) is an independent quality check conducted at the Chinese factory before the goods are loaded for export, typically after 80–100% of the production quantity is complete. The PSI is the buyer’s most important quality risk management tool for China-sourced goods — it allows the buyer to verify that the production goods match the approved samples and specifications, identify defects before shipment, and decide whether to release the balance payment and proceed with shipment, request rework, or reject the consignment. This guide provides a structured quality control checklist framework applicable to most product categories, with guidance on how to commission and interpret a professional PSI report.

Key points at a glance

• Pre-shipment inspection should be commissioned when 80–100% of the production quantity is complete and packaged, before the goods are loaded. This timing allows defects found to be reworked without delaying shipment significantly. Commissioning a PSI when only 50% of production is done risks finding the remaining 50% also defective; commissioning after loading removes the buyer’s ability to rework or sort before shipment

• The standard sampling plan for a PSI uses AQL (Acceptable Quality Level) statistical sampling under ISO 2859-1. For most consumer goods, AQL 2.5 for Major defects and AQL 4.0 for Minor defects is the industry standard. The inspection company draws a random sample from the production batch and counts defects in the sample — if the defect count exceeds the AQL acceptance number for the sample size, the inspection result is “FAIL”

• Defects are classified into three tiers: Critical (immediately dangerous or non-compliant — safety hazard, regulatory non-compliance, cannot be sold legally), Major (significant functional or aesthetic defect that makes the product unacceptable to most consumers — wrong colour, non-functioning part, significant damage), and Minor (small cosmetic imperfections that most consumers would accept). PSI pass/fail is based on Critical and Major defect counts at the AQL threshold

• The cost of a standard half-day PSI at a Chinese factory is typically USD 200–350 per inspector per day, booked through global inspection companies (SGS, Bureau Veritas, Intertek, TUV Rheinland, QIMA, Asia Inspection / QIMA) or through specialised sourcing agents. The inspection fee is paid by the buyer, not the supplier

Pre-shipment inspection checklist

1. Quantity and production completeness Major
  • Total production quantity matches PO quantity (count all cartons / units)
  • 80–100% of production is complete and packaged at time of inspection
  • No mixed production batches — all units from the same production run
  • Carton labelling matches purchase order (item number, quantity per carton, shipping marks)
2. Product appearance and workmanship Major
  • Colour matches approved colour swatch / approved sample (compare under standard lighting)
  • Surface finish: no scratches, dents, rust, stains, peeling, or uneven coating visible on 100% visual scan of sample units
  • Dimensions and tolerances within specification (measure critical dimensions with calipers/tape)
  • Logos, prints, and labels correctly positioned, aligned, and legible
  • Stitching, joints, welds, or assembly points show no visible defects
  • No sharp edges, burrs, or protrusions on safety-relevant areas
3. Functional testing Critical
  • All moving parts operate correctly through full range of motion
  • Electrical products power on, function correctly, and power off safely
  • Battery-powered products hold charge and function at rated capacity
  • Closures, latches, zips, and fasteners operate correctly through 10 cycles
  • Water resistance (if claimed) tested on sample units per specification
4. Packaging and inner packing Major
  • Retail packaging matches approved artwork and dimensions
  • Inner packing (foam, inserts, bags) matches approved specification
  • Carton strength adequate for stacking during shipping (box compression test)
  • Barcode(s) scan correctly and match declared SKU/GTIN
  • All required regulatory labelling present (CE, FCC, warning labels, country of origin)
  • Language on packaging matches destination market requirements
5. Safety and compliance Critical
  • CE / FCC / UL / other mandatory certification marks present and correctly formatted
  • No recalled components or restricted substances visually identifiable
  • Children’s products: small parts test, cord/strangulation hazard check, sharp edge test
  • Electrical products: spot check cable insulation, plug type correct for destination market
  • Materials match declared materials (e.g., stainless steel vs. plated carbon steel)

Include a Product Specification Sheet (PSS) with the inspection order — the inspector can only check against criteria you provide. Vague specifications produce vague inspection reports

The quality of a PSI report is directly proportional to the quality of the product specification you provide to the inspection company. A PSS that lists only “product must be of good quality” gives the inspector no objective criteria to check against. A well-prepared PSS for a PSI includes: (1) Physical dimensions with tolerances (millimetres or inches, with ±X tolerance); (2) Weight specifications (grams or kg, with tolerance); (3) Colour specifications (Pantone codes or approved colour swatch on file with the inspector); (4) Functional test criteria (what constitutes pass/fail for each functional test — e.g., “lock must withstand 50N tension without opening”); (5) Packaging specifications (carton dimensions, weight, compression rating); (6) Labelling requirements (barcode format, mandatory text, logo placement); (7) Defect classification (a list of your specific critical/major/minor defects for this product, described with examples). Inspection companies provide their own standard product defect classification guides as a starting point — customising these to your product significantly improves the actionability of the inspection report. Provide the PSS to the inspection company when booking the inspection, and confirm that the inspector has it at least 48 hours before the scheduled inspection date.

A PSI “PASS” does not guarantee that every unit in the shipment is defect-free — AQL sampling means a small percentage of defective units will statistically pass inspection. Understand the AQL limits before committing to your quality tolerance level

AQL (Acceptable Quality Level) sampling statistics mean that a production batch passing at AQL 2.5 for Major defects may still contain up to approximately 2.5% defective units in the total batch — the sample size is designed to detect batches with more than that level of defects with high statistical confidence, not to guarantee zero defects. For buyers with zero-defect tolerance (medical devices, safety-critical components, high-price consumer goods), standard AQL PSI is not sufficient — 100% inspection (sorting of every unit) is required for critical parameters. For most commercial consumer goods at AQL 2.5 for Major / 4.0 for Minor: a PSI PASS is a statistically reliable indicator that the production batch is at or below the AQL defect threshold, and is the appropriate level of quality verification for most commercial importing. When a PSI reports FAIL: the buyer’s standard options are (1) rework — supplier rectifies defective units at their cost and a re-inspection is conducted; (2) conditional acceptance with price reduction — buyer accepts the consignment at a negotiated discount reflecting the defect rate; (3) rejection — buyer refuses the goods and demands replacement or refund. The Purchase Order should specify which option applies and what the process is, to avoid disputes when a PSI fails.

Frequently asked questions

What is the difference between a pre-shipment inspection (PSI) and a factory audit, and when should I use each?
A pre-shipment inspection (PSI) and a factory audit are different tools that answer different questions. A factory audit (also called a supplier audit or factory assessment) evaluates the supplier’s production capability, quality management system, working conditions, and business legitimacy — it assesses whether the supplier is capable of producing goods to your standards consistently. A PSI evaluates whether a specific production run of goods meets your product specification — it checks the actual goods, not the facility. Factory audits are conducted before placing the first order with a new supplier, as part of supplier qualification. PSIs are conducted for each production order (or at minimum for new products and large orders) as a quality gate before shipment. The sequence: (1) Factory audit → (2) First sample order → (3) PSI on first production order → (4) Ongoing PSIs on subsequent orders based on supplier performance. For established suppliers with a consistent track record of PSI passes, buyers may move to a periodic rather than per-order PSI schedule. Neither replaces the other — a supplier whose audit shows excellent GMP can still produce a defective batch, and a passed PSI on one order does not prove the factory is capable for a different product category.
How should I handle a failed PSI report — what are my options and how do I document the dispute?
When a PSI report shows FAIL, the first step is to review the report in detail: which specific defects caused the failure, what defect counts were found against each AQL threshold, and are the defects in categories covered by your Purchase Order’s acceptance criteria. The options on a PSI fail are: (1) Rework and re-inspection: request the supplier rectify the failed units and re-inspect before shipment. This delays the schedule but is the right choice when defects are reworkable and the supplier accepts responsibility. The supplier typically bears the rework cost; the re-inspection cost depends on who caused the failure (usually also the supplier for first-fail). (2) Sort and rework partial consignment: if defects are concentrated in some units, 100% sorting can separate acceptable and defective units, and only acceptable units ship. The buyer pays for sorting, the supplier bears the cost of rejected units. (3) Conditional acceptance with price reduction: accept the goods at a commercial price reduction negotiated with the supplier, proportionate to the defect rate. Document the agreement in writing before releasing payment. (4) Full rejection: refuse the consignment. This requires a clear contractual basis (your PO’s acceptance criteria) and prompt written notice to the supplier, with the PSI report as evidence. If the supplier disputes the finding, a re-inspection by a different inspector can be used for independent confirmation. All communication about a PSI fail should be in writing (email, with the PSI report attached) to create a documented record for any subsequent dispute resolution or Trade Assurance claim.

MandarinDesk coordinates pre-shipment inspections at Chinese factories across all product categories, with bilingual inspection teams and same-day reporting. Contact us.

Need a hand?

Tell us what you need done in China. We reply within 24 hours with a fixed price and timeline.

Get a free quote →

Similar Posts